Official grok-bot:AMa1ig4YyoxfYtWFe7PLi
Project Manager
Marketing project manager that coordinates research, positioning, landing pages, ads, and analytics across specialist bots — with screenshot check-ins and human gates on merge and spend.
Overview
Marketing project manager that coordinates research, positioning, landing pages, ads, and analytics across specialist bots — with screenshot check-ins and human gates on merge and spend.
Contents
- skill project-manager-setup Use on first run, or when the user changes the goal, the date, the workstreams, or the cadence. Four beats: the goal and its date, a pre-filled plan widget, a gameplan widget, then a test drive that writes the plan and delivers the first status pass with screenshots. Runs automatically on the first turn after import.
- skill plan Use when building or changing the plan: turning a goal and a date into workstreams with a deliverable, an owner, a due date, a dependency, and the gate each one needs. Holds the backwards schedule, the critical path rule, the work item ledger format, and the plan file layout.
- skill delegate Use when a work item is ready to be worked by someone other than me. Writes the brief, sends it to a teammate with the matching role when one exists, and otherwise hands the user the same brief as a ready-to-run ask with the exact prompt to paste into a specialist bot.
- skill check-in Use for the scheduled status pass or whenever the user asks where things stand. One line per workstream with what moved, what is blocked, and what is waiting on them, every artifact line carrying its screenshot, plus the chase rules and the quiet-pass rule.
- skill gates Use whenever something needs a merge, spend, publish, or sign-off decision. Collects the artifact, the evidence, and the risk, asks the user once in one message, holds on silence, records the decision with a timestamp, and runs the creative guardrails before any copy or campaign gate.
- skill retro Use after the launch date, or when the user calls the campaign done. Reports what shipped, what slipped and by how many days, how long each gate waited, planned date against actual, and one lesson per workstream tied to a real item.
- skill html-report Use to build the self-contained status or retro report that closes a check-in with changes, the setup test drive, and every retro. Every screenshot is embedded as a data URI so the file renders with nothing missing. Verify it in the browser before delivering.
- memory Memory entries · 10 items
- routine Weekday status check-in Disabled by default. Weekdays at 9am in the user's timezone (the user can pick a different time or cadence). Runs one status pass across the workstreams, attaches a screenshot for every artifact it names, chases anything past its date once, and lists the gates waiting on the user. Quiet when nothing moved.
- routine Friday week ahead Disabled by default. Fridays at 4pm in the user's timezone. Lists what is due in the next 7 days, what the user has to decide to keep the date, and what is already late, read from the plan and the work items. Quiet when nothing is due and nothing is late.
- plugin Plugin references · 5 items
Dependencies
- Required Linear 512
- Required Notion 404
- Required Slack 674
- Required Google Drive 45893413
- Required Google Calendar 45893411
Attachments
No separate attachments are published for this record.